For best experience,
please rotate your phone
horizontally

Loading

Contact Us

This form collects your name, company name, email, phone so that our customer responsible manager can communicate with you and provide assistance. Please check our Privacy Policy to see how we protect and manage your submitted data.


Ongoing Projects

Apartment building
London, UK

Apartment building, that includes 48 modules, 1538.26 sqm of modular structure. With brick cladding facade, clean lines and crafted interior the building is made to match the architecture and keep the historical presence in the area.

Forta Pro scope of work includes design, production and assembling of prefabricated apartment, fully finished and equipped with WC and kitchen appliances.

Apartment Building, Sweden

The apartments project concerns production of a building with two stories in total of 30 apartments in Södertälje, Sweden.
Forta PRO scope of work includes design, production, delivery and positioning of 48 modules.
Project Volume: 2000 m2
Modular area in m2: 1797 m2
Realization time: Modules delivery in summer 2019

Clinic, Denmark 

The emergency reception, with a total of 750 new square meters, which will accommodate a new reception and a temporary radiology clinic. The new area covers an X-ray department of 500 square meters and an expansion of emergency space of 250 square meters. 

Forta PRO scope of work includes design, production, shipment and positioning of prefabricated volumetric modules.

Hotel Building, Sweden

The production of the new 3-star modular hotel. This project is very challenging. By choosing prefabricated modular solution, most of the construction problems were solved.
The Hotel is located in Göteborg city center, with limited space for the material storage and equipment work. The client needs to extend extra 4 floors to existing hotel with minimal disturbance for the daily operation of the existing hotel. The installation plans should be done within 10 days. 
Forta PRO scope of work includes design, production, delivery and positioning of the 39 modules (40 rooms,
1031 m2 of modular area).

Hotel Building, Sweden

The production of the new 3-star modular hotel. This project is very challenging. By choosing prefabricated modular solution, most of the construction problems were solved.
The Hotel is located in Göteborg city center, with limited space for the material storage and equipment work. The client needs to extend extra 4 floors to existing hotel with minimal disturbance for the daily operation of the existing hotel. The installation plans should be done within 10 days. 
Forta PRO scope of work includes design, production, delivery and positioning of the 39 modules (40 rooms,
1031 m2 of modular area).